Pillar has joined forces with several other engineering firms to help in the design and construction of the new water plant on the New River. Pillar’s responsibility in this project is limited to boundary and topographic survey and plats for design and construction inspection for the three divisions. Division I was the plant and intake construction. Division II included the installation of the 30 inch raw and 24 inch finish water line. Division III was the hanging of a 24 inch concrete insulated steel pipe on a steel girder bridge crossing the New River. The plant is scheduled to be fully operational and providing water to several municipalities Spring 2009 which is approximately 6 months ahead of schedule.
|
|
- Topographic Survey
- Survey Plat Preparation
- Construction Inspection
Download Information Sheet
|